Skip to main content
Library

Reliability Coordinator procedures

38 documents

38 of 38 results
Title Type Posted
RC0430 GMD Operating Plan 528.96 KB Procedure 10/31/2024, 2:58 PM
RC0420 Event Reporting 290.54 KB Procedure 10/31/2024, 2:58 PM
RC0670 NERC PRC-002 Disturbance Monitoring and Reporting Requirements Process 469.79 KB Procedure 10/10/2024, 9:32 AM
RC0460F EOP-005 Plan Review Checklist 61.67 KB Procedure 10/01/2024, 11:10 AM
RC0430A EOP-010 Plan Review Checklist 58.81 KB Procedure 10/01/2024, 11:10 AM
RC0410A EOP-011 Plan Review Checklist 64.65 KB Procedure 10/01/2024, 11:10 AM
RC0310 Mitigating SOL and IROL Exceedances 787.18 KB Procedure 10/01/2024, 11:10 AM
RC0110 Communications Protocols 435.18 KB Procedure 08/15/2024, 10:30 AM
RC0410 System Emergencies 761.61 KB Procedure 06/14/2024, 8:43 AM
RC0320 Outage Review and Coordination 480.12 KB Procedure 06/14/2024, 8:43 AM
RC0460 Reliability Coordinator Area Restoration Plan 730.74 KB Procedure 05/30/2024, 11:27 AM
RC0330 Coordination with Neighboring Reliability Coordinators 500.47 KB Procedure 05/30/2024, 11:27 AM
RC0120A RC West IRO-010 Data Specification 69.54 KB Procedure 05/30/2024, 11:27 AM
RC0610 System Operating Limits Methodology for the Operations Horizon 1.74 MB Procedure 04/16/2024, 8:23 AM
RC0120B RC West IRO-010 Data Specification for Adjacent RCs 62.54 KB Procedure 04/01/2024, 9:31 AM
RC0120C ICCP or PMU Data Request Procedure 367.18 KB Procedure 04/01/2024, 9:31 AM
RC0650 Steady-State and Dynamic System Model Validation: NERC MOD-033 444.98 KB Procedure 04/01/2024, 9:31 AM
RC0120 Guidelines for RC West IRO-010 Data Specification and Collection 1.01 MB Procedure 04/01/2024, 9:31 AM
RC0660 Transmission Relay Loadability: NERC PRC-023 518.12 KB Procedure 04/01/2024, 9:30 AM
RC0130 Notification Requirements for Real-Time Events 650.81 KB Procedure 04/01/2024, 9:30 AM
RC0550 Reliability Coordinator Procedure Development, Maintenance and Distribution 666.25 KB Procedure 04/01/2024, 9:30 AM
RC0610A Criteria for Determining Facilities Critical to Derivation of IROL 462.04 KB Procedure 04/01/2024, 9:30 AM
RC0640 Transmission Near-Term Planning Assessments: NERC-IRO-017 470.11 KB Procedure 04/01/2024, 9:30 AM
RC0690B PRC-012 Process - RAS Design Review 794.17 KB Procedure 01/18/2024, 11:07 AM
RC0630 Outage Coordination Process 1.02 MB Procedure 01/18/2024, 11:07 AM
RC0690 PRC-012 Remedial Action Schemes 679.84 KB Procedure 01/18/2024, 11:07 AM
RC0690C PRC-012 Remedial Action Schemes - Corrective Action Plan (CAP) and Results 62.94 KB Procedure 01/18/2024, 11:07 AM
RC0690A PRC-012 Remedial Action Schemes - RAS Review Checklist 148.80 KB Procedure 01/18/2024, 11:07 AM
RC0600 RC West Implementation of Common Interconnection-wide Methodology 519.30 KB Procedure 12/13/2023, 8:14 AM
RC0620 Operations Planning Analysis (Next Day) 488.01 KB Procedure 12/13/2023, 8:14 AM
RC0600A Western Interconnection Modeling and Monitoring Common Methodology 934.99 KB Procedure 12/13/2023, 8:14 AM
RC0100 Reliability Coordinator Authority 315.74 KB Procedure 10/18/2023, 9:05 AM
RC0210 Monitoring Frequency and Balancing Authority Performance 629.45 KB Procedure 07/13/2023, 8:45 AM
RC0140 Guidelines for Sending Messages Across RC Seams 588.23 KB Procedure 06/15/2023, 2:34 PM
RC0220 Time Error Correction 304.04 KB Procedure 11/28/2022, 9:34 AM
RC0680 RC Guidelines for Seasonal Assessment and Coordination Process 1.01 MB Procedure 08/24/2022, 8:24 AM
RC0540A RC West WIT Schedule Change Process 920.75 KB Procedure 08/24/2022, 8:24 AM
RC0540 WIT Administration 862.35 KB Procedure 03/24/2022, 9:38 AM
No results
Back to top